A letter from a licensed structural (or truss) engineer shall be submitted with an original wet stamp at time of fire sprinkler plan review, verifying the roof is capable of accepting the point loads imposed on the building by the fire sprinkler system design.
Action Required:
- A letter from a licensed structural (or truss) engineer shall be submitted with an original wet stamp at time of fire sprinkler plan review, verifying the roof is capable of accepting the point loads imposed on the building by the fire sprinkler system design.
- Please upload the letter into your EZOP Account.
- If you do not know how to upload an attachment, please review the "Add An Attachment” video on the "Home" page of the EZOP web portal.